Dagang (Tianjin) Instrument Ltd.
Products
Contact Us
  • Contact Person : Mr. Liu Andy
  • Company Name : Dagang (Tianjin) Instrument Ltd.
  • Tel : 0086-22-23305338
  • Fax : 0086-22-23306258
  • Address : Tianjin,TIANJIN,Rm 20D, Tower A,66# Nanjing Road
  • Country/Region : China
  • Zip : 300042

IC card Prepayment Gas Meter

IC card Prepayment  Gas Meter
Product Detailed
Related Categories:Flow Meters

Detailed Product Description


 

We are a large professional enterprise producing flow meter.

For 2008 Olympic Games,construction of WATER CUBE had used our meters.

 

Since it passed the ISO9001 quality system certification in 2001, the plant has also obtained the works approval certificate of China Classification society.

Feature:

1.      Different types of gas meter for domestic, commercial and industry applications.

2.      We had provided different users in energy area,chemical industry etc.

3.      can be prepayment and auto read system

Specifications:

1. General: The case is made of aluminum alloy by die casting. And the plastic part is processed and formed by high strength engineering plastic. The whole meter still can reach each requirement under long-term working owing to the high quality material and reasonable structural design. The technical criteria of this gas meter comply with the requirement provision in <GB/T 6968 Diagram Type Gas Meter) &International standard OIML-R31.It is the most suitable measuring instrument in fuel gas area.

2. Application: This gas meter is suitable for measuring natural gas liquefied petroleum gas, artificial gas, air and other noncorrosive gas.

3. Characteristics: Diaphragm structure, advanced process, big character wheel, counting device, accurate measuring.

4. Installation:

1) Pls read the users directions carefully before installation. It should be installed e qualified professional department that complies with the requirement of GB50028 GAS design specification.

2) Selecting left inlet or right inlet of gas meter according to the pipeline position. Install the junction and connected with the pipeline of the owner according to the airflow direction.

3 During the installation, storage and transportation, it is forbidden to break, touch, convert and shake. And do not open the surface at will to avoid entering water and sundries.

4) It should fill with 10kPa air (or other effective methods)to conduct air tightness examination after finishing installing. It should not put in use until ensuring.



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.